CRIT
Saint-Ouen, France
Construction
Type: Offices
Program: Construction
Year: 2014
Status: Work in progress
Area: 14,610 m2 GFA
Mission Type: Project management and project management environment
Client: Groupe CRIT
Sponsor: Eiffage Immobilier
Architect: Architecture SA Pierre and Cédric Vigneron,
Cost: 31 M €
Performances: HQE® certification, BBC label
Presentation of the project
Construction of an office building in the ZAC Porte de Saint-Ouen in the context of an HEQ.
Environmental strategies
> Audit of deconstruction and site charter low nuisance
> Optimized Urban integration and differential treatment of the facades,
> Energy efficiency of the envelope,
> Optimization of daylighting,
> Materials with low environmental impact and health quality spaces,
> Use of local energy resources (CPCU)
> Optimal Waste Management,
> Establishment of water-saving systems (30% less potable water)
> Performance equipment and continuous performance monitoring (GTB)
© Pierre et Cédric Vigneron architectes
© Pierre et Cédric Vigneron architectes